Chapter 9: Cabling the AT-SBx81CFC960 Controller Fabric Card
190
Section II: Installing the Chassis
Figure 114. Attaching a Fiber Optic Cable to an SFP+ Transceiver in the
AT-SBx81CFC960 Controller Fabric Card
7. Repeat this procedure to install additional SFP+ transceivers in the
AT-SBx81CFC960 Controller Fabric Card.
8. If you are not building a stack with the VCStack Plus feature, do one of
the following:
To install and cable additional transceivers in the chassis, go to the
appropriate section in this chapter for instructions.
After cabling all the ports in the chassis, go to Chapter 10,
“Powering On the Chassis” on page 193.
9. If you are building a stack with the VCStack Plus feature, do the
following:
Double-check the wiring of the cables of the trunk between the
SFP+ slots of the controller cards of the two chassis to be sure
they are connected correctly. The possible wiring configurations
are given in “Cabling Configurations for the Trunk” on page 305.
Summary of Contents for AT-SB*81CFC960
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Page 96: ...96...
Page 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Page 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Page 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Page 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Page 300: ...300...
Page 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...