SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section I: Hardware Overview
23
Figure 2. Front View of the AT-SBx8106 Chassis
Note
Do not remove the shipping brace from the front of the chassis until
after the unit is installed in the equipment rack. You might bend the
chassis and cause misalignment of the slots and card guides if you
lift the chassis into the equipment rack without the shipping brace.
Figure 3. Rear View of the AT-SBx8106 Chassis
Shipping Brace
Slots for Ethernet
Line Cards and
Controller Cards
PoE Power
Supply Slots
System Power
Supply Slots
Slots for Ethernet
Line Cards and
Controller Cards
AT-SBxFAN06
Module
ESD Wrist
Strap Plug
Grounding
Lug
AC Power
Cord Sockets
Power Supply
Interfaces
(Opto-couplers)
Summary of Contents for AT-SB*81CFC960
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Page 96: ...96...
Page 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Page 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Page 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Page 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Page 300: ...300...
Page 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...