SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section III: Building a Stack with VCStack Plus
329
Setting the Priority Number
This procedure is optional. It explains how to set the stack priority number
on the chassis, which controls the selection of the active controller card for
the stack. For background information, refer to “Priority Numbers” on
page 311. If you do not want to set the priority number, go to “Powering Off
the Chassis” on page 330.
To configure the priority number, perform the following procedure:
1. Enter the CONFIGURE TERMINAL to move from the Privileged Exec
mode to the Global Configuration mode.
awplus# configure terminal
awplus(config)#
2. Enter the STACK PRIORITY command to set the priority number of
the chassis. The format of the command is as follows:
stack <ID_number> priority <priority_number>
The ID_number variable is the switch’s current ID number, displayed
with the SHOW STACK command. The priority_number variable is the
new priority number for the chassis. The range is 0 to 255. The lower
the number, the higher the priority. This example sets the priority
number of the chassis to 1:
awplus(config)# stack 1 priority 1
The switch displays the following prompt:
% Warning: Stacking is currently disabled.
3. Enter the EXIT command to return to the Privileged Exec mode:
awplus(config)# exit
awplus#
4. Enter the SHOW STACK command to confirm your change. Refer to
Figure 198 on page 328. The Priority column should now be displaying
the new priority number for the chassis.
5. Enter the COPY RUNNING-CONFIG command to save your change:
awplus# copy running-config startup-config
This completes the procedure for configuring the chassis for the stacking
feature. Go to “Powering Off the Chassis” on page 330.
Summary of Contents for AT-SB*81CFC960
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Page 96: ...96...
Page 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Page 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Page 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Page 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Page 300: ...300...
Page 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...