Chapter 6: Installing the Power Supplies
128
Section II: Installing the Chassis
4. Move the locking handle on the power supply to the unlocked or up
position. See Figure 54 on page 128.
Figure 54. Unlocking the Handle on the Power Supply
5. Align and insert the power supply into the power supply slot. Figure 55
shows the power supply installed in slot D.
Figure 55. Inserting the AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC
System Power Supply
Summary of Contents for AT-SB*81CFC960
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Page 96: ...96...
Page 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Page 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Page 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Page 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Page 300: ...300...
Page 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...