SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
139
Figure 64. On/Off Switch on the AT-SBxPWRSYS1 DC Power Supply
5. With a #2 Phillips-head screwdriver, loosen the handle locking screw
on the power supply, as shown in Figure 65.
Figure 65. Loosening the Handle Locking Screw on the AT-SBxPWRSYS1
DC Power Supply
6. Raise the locking handle on the AT-SBxPWRSYS1 DC Power Supply,
as shown Figure 66 on page 140.
On/Off
Switch
Summary of Contents for AT-SB*81CFC960
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Page 96: ...96...
Page 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Page 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Page 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Page 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Page 300: ...300...
Page 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...