SwitchBlade x8106 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section II: Installing the Chassis
135
6. Lower the locking handle of the power supply module to secure the
module in the slot, as shown in Figure 61.
Figure 61. Locking the Handle on the AT-SBxPWRPOE1 Power Supply
Note
If the module does not fully seat in the chassis slot, check to be sure
you are installing a PoE power supply and not a system power
supply. The model name of the module is included on a label on the
locking handle. For more information, refer to “Power Supplies and
Power Supply Slots” on page 26.
7. To install a second AT-SBxPWRPOE1 Power Supply, repeat this
procedure.
8. After installing the AT-SBxPWRPOE1 Power Supplies, go to Chapter
7, “Installing the AT-SBx81CFC960 Controller and Ethernet Line
Cards” on page 143.
Note
Retain the tie wrap that comes with the power supply. You use it to
secure the power cord to the chassis when you power on the unit in
“Powering On AT-SBxPWRPOE1 Power Supplies” on page 198.
Summary of Contents for AT-SB*81CFC960
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 94: ...Chapter 3 AT SBx81CFC960 Controller Fabric Card 94 Section I Hardware Overview...
Page 96: ...96...
Page 142: ...Chapter 6 Installing the Power Supplies 142 Section II Installing the Chassis...
Page 230: ...Chapter 10 Powering On the Chassis 230 Section II Installing the Chassis...
Page 254: ...Chapter 12 Troubleshooting 254 Section II Installing the Chassis...
Page 298: ...Chapter 14 Upgrading the Controller Fabric Card 298 Section II Installing the Chassis...
Page 300: ...300...
Page 314: ...Chapter 15 VCStack Plus Overview 314 Section III Building a Stack with VCStack Plus...