© Published by permission of the copyright owner – DO NOT COPY or TRANSMIT
Testing Machine and Electronic Control Functions
91
802953
Production Test Cycle
To Enter Production Test Cycle
1. Be certain control is in Ready Mode and access
panel or coin vault is open.
2. While pressing and holding the NORMAL 40
keypad with one hand, press the PERM PRESS
60 keypad with the other hand.
3. When the control enters the Production Test
Cycle, it will first display “
S XX
” with the “
XX
”
showing the software version of the control.
4. The control will advance through the sequence of
test steps whenever START (enter) is pressed,
with the exception of the Keypad Test. Refer to
Table 18
for all tests in the Production Test
Cycle.
To Exit Production Test Cycle
To exit a test step, press START (enter) unless
otherwise noted in
Table 18
.
Table 17 (continued)
CONFIG
VALUE
COIN HEADER
PRESENT
NETWORK
BOARD
PRESENT
CARD
READER
PRESENT
COIN DROP
#2
PRESENT
COIN DROP
#1
PRESENT
88
ON
ON
OFF
OFF
OFF
89
ON
ON
OFF
OFF
ON
90
ON
ON
OFF
ON
OFF
91
ON
ON
OFF
ON
ON
92
ON
ON
ON
OFF
OFF
93
ON
ON
ON
OFF
ON
94
ON
ON
ON
ON
OFF
95
ON
ON
ON
ON
ON
NOTE: Configuration values 80-95 are on software version “S 02” or higher only.
Table 17
Summary of Contents for ST3LXFSP401NW22
Page 2: ......