![Agilent Technologies 8890 Maintaining Manual Download Page 128](http://html.mh-extra.com/html/agilent-technologies/8890/8890_maintaining-manual_2867678128.webp)
8
Maintaining the MMI
To Install a Capillary Column with the Multimode Inlet
128
Maintaining Your GC
10
While holding the inlet base with a wrench thread the column nut into the inlet (but do not
tighten).
11
Adjust the column position so that the septum contacts the bottom of the column nut.
Finger-tighten the column nut until it begins to grip the column.
12
While holding the inlet base with one wrench, use the second wrench to tighten the column
nut an additional 1/4 to 1/2 turn so that the column cannot be pulled from the fitting with
gentle pressure.
13
Plug in the new column’s Smart ID key. See
.
10
%
12 mm
Summary of Contents for 8890
Page 1: ...Agilent 8890 Gas Chromatograph Maintaining Your Gas Chromatograph GC ...
Page 8: ...8 Maintaining Your GC ...
Page 22: ...2 Removing Covers To Remove the Electronics Cover 22 Maintaining Your GC ...
Page 142: ...8 Maintaining the MMI To Bakeout Contaminants from the MMI 142 Maintaining Your GC ...
Page 178: ...10 Maintaining the VI To Bakeout Contaminants from the VI Inlet 178 Maintaining Your GC ...
Page 208: ...12 Maintaining the TCD To Bakeout Contaminants from the TCD 208 Maintaining Your GC ...
Page 240: ...14 Maintaining the ECD To Bakeout the ECD 240 Maintaining Your GC ...
Page 264: ...16 Maintaining EPC Modules Installing or Replacing Frits in the PCM 264 Maintaining Your GC ...
Page 276: ...17 Maintaining a Valve To Install the Upper Valve Box 276 Maintaining Your GC ...