10 Maintaining the VI
To Install a Capillary Column with the Volatiles Interface
Maintaining Your GC
169
9
Insert the column into the interface and finger-tighten the column nut.
10
Adjust the column (
not
the septum) position until the septum is snug against the bottom of
the nut.
11
Tighten the column nut an additional 1/4 to 1/2 turn with a wrench so that the column
cannot be pulled from the fitting with gentle pressure.
12
Plug in the new column’s Smart ID key. See
.
Figure 37.
Insert Smart ID key
13
Configure the new column.
14
With the sample transfer line attached and the column attached to the inlet and detector,
establish a flow of carrier gas through the transfer line. Purge as recommended by the
column manufacturer.
15
Condition the column per the manufacturer’s recommendation. See
16
Install the column into the detector.
•
To Install a Capillary Column in the FID
•
To Install a Capillary Column in the NPD
•
To Install a Capillary Column in the TCD
•
To Install a Capillary Column in the ECD
•
To Install a Capillary Column to the FPD+
17
Exit maintenance mode. Select
Maintenance > Instrument > Perform Maintenance >
Maintenance Mode > Finished.
18
After the column is installed at both inlet and detector, establish a flow of carrier gas and
purge as recommended by the column manufacturer.
19
Restore the analytical method.
•
For FPD+, immediately turn off the flame.
•
For NPD, immediately turn off the bead.
Smart ID key
Summary of Contents for 8890
Page 1: ...Agilent 8890 Gas Chromatograph Maintaining Your Gas Chromatograph GC ...
Page 8: ...8 Maintaining Your GC ...
Page 22: ...2 Removing Covers To Remove the Electronics Cover 22 Maintaining Your GC ...
Page 142: ...8 Maintaining the MMI To Bakeout Contaminants from the MMI 142 Maintaining Your GC ...
Page 178: ...10 Maintaining the VI To Bakeout Contaminants from the VI Inlet 178 Maintaining Your GC ...
Page 208: ...12 Maintaining the TCD To Bakeout Contaminants from the TCD 208 Maintaining Your GC ...
Page 240: ...14 Maintaining the ECD To Bakeout the ECD 240 Maintaining Your GC ...
Page 264: ...16 Maintaining EPC Modules Installing or Replacing Frits in the PCM 264 Maintaining Your GC ...
Page 276: ...17 Maintaining a Valve To Install the Upper Valve Box 276 Maintaining Your GC ...