![Agilent Technologies 8890 Maintaining Manual Download Page 245](http://html.mh-extra.com/html/agilent-technologies/8890/8890_maintaining-manual_2867678245.webp)
15 Maintaining the FPD+
To Install a Capillary Column to the FPD+
Maintaining Your GC
245
To Install a Capillary Column to the FPD+
1
Gather the following:
•
Column measuring tool, see
“Consumables and Parts for the FPD+”
•
Column cutter
•
1/4-inch and 7/16-inch wrenches
•
Column nut
•
Ferrule
•
Capillary column
•
Lint-free gloves
2
Place GC in maintenance mode:
Maintenance > Instrument > Perform Maintenance >
Maintenance Mode > Start Maintenance.
Wait for the GC to become ready.
WARNING
Be careful! The oven and/or detector may be hot enough to cause burns. If the detector is
hot, wear gloves to protect your hands.
WARNING
Wear safety glasses to protect your eyes from flying particles while handling, cutting, or
installing glass or fused silica capillary columns. Use care in handling these columns to
prevent puncture wounds.
CAUTION
Wear clean, lint-free gloves to prevent contamination of parts with dirt and skin oils.
3
Assemble a septum, column nut, and ferrule on the end of the column.
4
Insert the end of the column through the column measuring tool so that the end protrudes
beyond the tool.
5
Tighten the column nut until it grips the column. Tighten the nut an additional 1/8 to 1/4
turn with a pair of wrenches. Snug the septum against the base of the column nut.
6
Use a wafer cutter at 45 ° to score the column.
7
Snap off the column end. The column may protrude about 1 mm beyond the end of the
tool. Inspect the end with a magnifying loupe to make certain that there are no burrs or
jagged edges.
137.5 mm
Score column here
Ferrule
Column nut
Column measuring tool
Summary of Contents for 8890
Page 1: ...Agilent 8890 Gas Chromatograph Maintaining Your Gas Chromatograph GC ...
Page 8: ...8 Maintaining Your GC ...
Page 22: ...2 Removing Covers To Remove the Electronics Cover 22 Maintaining Your GC ...
Page 142: ...8 Maintaining the MMI To Bakeout Contaminants from the MMI 142 Maintaining Your GC ...
Page 178: ...10 Maintaining the VI To Bakeout Contaminants from the VI Inlet 178 Maintaining Your GC ...
Page 208: ...12 Maintaining the TCD To Bakeout Contaminants from the TCD 208 Maintaining Your GC ...
Page 240: ...14 Maintaining the ECD To Bakeout the ECD 240 Maintaining Your GC ...
Page 264: ...16 Maintaining EPC Modules Installing or Replacing Frits in the PCM 264 Maintaining Your GC ...
Page 276: ...17 Maintaining a Valve To Install the Upper Valve Box 276 Maintaining Your GC ...