![Agilent Technologies 8890 Maintaining Manual Download Page 153](http://html.mh-extra.com/html/agilent-technologies/8890/8890_maintaining-manual_2867678153.webp)
9
Maintaining the PTV Inlet
To Replace the Septumless Head PTFE Ferrule on the PTV Inlet
Maintaining Your GC
153
12
Observe the inlet
Total Flow
. Tighten the guide cap until the
Total Flow
stops decreasing
(typically near 8 mL/min).
13
Remove the syringe from the inlet and press
.
14
Restore the analytical method.
15
Perform an inlet
Leak & Restriction
test and reset the maintenance counters.
Summary of Contents for 8890
Page 1: ...Agilent 8890 Gas Chromatograph Maintaining Your Gas Chromatograph GC ...
Page 8: ...8 Maintaining Your GC ...
Page 22: ...2 Removing Covers To Remove the Electronics Cover 22 Maintaining Your GC ...
Page 142: ...8 Maintaining the MMI To Bakeout Contaminants from the MMI 142 Maintaining Your GC ...
Page 178: ...10 Maintaining the VI To Bakeout Contaminants from the VI Inlet 178 Maintaining Your GC ...
Page 208: ...12 Maintaining the TCD To Bakeout Contaminants from the TCD 208 Maintaining Your GC ...
Page 240: ...14 Maintaining the ECD To Bakeout the ECD 240 Maintaining Your GC ...
Page 264: ...16 Maintaining EPC Modules Installing or Replacing Frits in the PCM 264 Maintaining Your GC ...
Page 276: ...17 Maintaining a Valve To Install the Upper Valve Box 276 Maintaining Your GC ...