
ENGINE
4-40
3. Install the cam chain guide and dowel pins into the cylinder.
Verify the bottom end is seated properly in the crankcase.
4. Pull the cam chain through the cylinder chain room and
secure with mechanic’s wire.
5. Position crankshaft at Top Dead Center (TDC) on
compression stroke.
6. Install 2-dowel pin onto cylinder.
CYLINDER HEAD AND CAMSHAFT
INSTALLATION
NOTE: Clean the gasket surfaces on the cylinder
head and cylinder. Remove all traces of old gasket
material.
1. Install the dowel pin(s) and a new cylinder head gasket.
2. Pull the cam chain through the cylinder head chain room
and secure with mechanic’s wire.
3. Place the cylinder head on the cylinder.
Summary of Contents for AT56-69E
Page 35: ...MAINTENANCE 2 25 ...
Page 45: ...CVT SYSTEM 3 4 CVT EXPLODED VIEW ...
Page 56: ...ENGINE 4 3 ENGINE ILLUSTRATION ENGINE EXPLODED VIEW ...
Page 57: ...ENGINE 4 4 ...
Page 58: ...ENGINE 4 5 COOLING SYSTEM EXPLODED VIEW ...
Page 59: ...ENGINE 4 6 OIL FLOW DIAGRAM ...
Page 125: ...FUEL AND CARBURETOR 6 15 FUEL TANK SYSTEM ...
Page 135: ...BODY SUSPENSION STEERING 7 6 SUSPENSION ...
Page 142: ...BODY SUSPENSION STEERING 7 13 STEERING ...
Page 151: ...BRAKES 8 6 FRONT BRAKE EXPLODED VIEW MASTER CYLINDER ...
Page 196: ...ELECTRICAL 9 31 WIRE DIAGRAM ...