
TRANSMISSION
5-6
5
5. Remove forward gear and dog components until next snap ring.
Snap ring pressure can cause rings and pliers to eject
suddenly. Use care during removal.
7. Inspect the shaft and gears visually without excessive wear or
crack. Replace any damaged components.
8. Assemble the reverse gear, washer, a new snap ring, and the
sliding gear on the shaft.
9. Assemble the forward gear, washer, bush and a new snap ring,
on the shaft.
6. Remove second snap ring from main shaft.
COUNTER SHAFT INSPECTION
Inspect the shaft and gears visually without excessive wear or
crack. Replace any damaged components.
6. Remove reverse gear components.
OUTPUT SHAFT REMOVAL AND INSPECTION
1. Remove the snap ring from output shaft.
Summary of Contents for AT56-69E
Page 35: ...MAINTENANCE 2 25 ...
Page 45: ...CVT SYSTEM 3 4 CVT EXPLODED VIEW ...
Page 56: ...ENGINE 4 3 ENGINE ILLUSTRATION ENGINE EXPLODED VIEW ...
Page 57: ...ENGINE 4 4 ...
Page 58: ...ENGINE 4 5 COOLING SYSTEM EXPLODED VIEW ...
Page 59: ...ENGINE 4 6 OIL FLOW DIAGRAM ...
Page 125: ...FUEL AND CARBURETOR 6 15 FUEL TANK SYSTEM ...
Page 135: ...BODY SUSPENSION STEERING 7 6 SUSPENSION ...
Page 142: ...BODY SUSPENSION STEERING 7 13 STEERING ...
Page 151: ...BRAKES 8 6 FRONT BRAKE EXPLODED VIEW MASTER CYLINDER ...
Page 196: ...ELECTRICAL 9 31 WIRE DIAGRAM ...