
ELECTRICAL
9-27
1. Disconnect the negative battery cable and starter motor
harness. Remove the (2) bolts from the starter and pull it from
the engine.
2. Remove the 2 main screws.
3. Remove magnet housing while holding the armature and
brush holder section together.
STARTER BRUSH INSPECTION /
REPLACEMENT
1. Release the brush coil spring away.
2. Push the armature out of case.
3. Using an Ohmmeter, measure the resistance between the
cable terminal and the insulated brush. The reading should
be .3 ohms or less. Measure the resistance between the cable
terminal and brush housing. Make sure the brush is not
touching the case. The reading should be infinite (no reading).
4. Remove the brush plate and brushes. Measure the brush
length and replace if worn past the service limit.
Brush Length Service Limit
10 mm (0.40“)
Summary of Contents for AT56-69E
Page 35: ...MAINTENANCE 2 25 ...
Page 45: ...CVT SYSTEM 3 4 CVT EXPLODED VIEW ...
Page 56: ...ENGINE 4 3 ENGINE ILLUSTRATION ENGINE EXPLODED VIEW ...
Page 57: ...ENGINE 4 4 ...
Page 58: ...ENGINE 4 5 COOLING SYSTEM EXPLODED VIEW ...
Page 59: ...ENGINE 4 6 OIL FLOW DIAGRAM ...
Page 125: ...FUEL AND CARBURETOR 6 15 FUEL TANK SYSTEM ...
Page 135: ...BODY SUSPENSION STEERING 7 6 SUSPENSION ...
Page 142: ...BODY SUSPENSION STEERING 7 13 STEERING ...
Page 151: ...BRAKES 8 6 FRONT BRAKE EXPLODED VIEW MASTER CYLINDER ...
Page 196: ...ELECTRICAL 9 31 WIRE DIAGRAM ...