STEP 7:
Install the DVE board into the topmost slot in the chassis.
There will be an empty board slot between the Switcher and
DVE boards.
STEP 8:
From this point, update the software by following the
instructions that came with the DVE Option Installation Kit.
SUPER CHARGER SUB-BOARD
U1
Figure 3-7 DVE Super Charger Sub-Board Location
Option Installation
8150 Technical Guide
3-12
Option Installation
9100-0212-04 - May 2000
Summary of Contents for ASWR8150
Page 12: ...Table of Contents 8150 Technical Guide X Contents 9100 0212 04 May 2000...
Page 39: ......
Page 80: ...Control Panel Connector Detail 8150 Technical Guide 2 40 Installation 9100 0212 04 May 2000...
Page 109: ...Option Installation 8150 Technical Guide 3 30 Option Installation 9100 0212 04 May 2000...
Page 236: ...8150 Partial Parts List 8150 Technical Guide A 6 Appendix 9100 0212 04 May 2000...