Unpacking the system
Risk of injury in the area of the gas sampling system due to moving or fall-
ing parts, anti-freeze, lubricating oil
Wear general personal protective equipment:
Closed overalls with long trousers and long sleeves
Safety shoes
Safety gloves suitable for mechanical work
Safety glasses
Protective helmet
If necessary, additional protective equipment if prescribed by the operator.
Danger of crushing when lifting or lowering the transport unit
Only appropriately trained personnel may transport the transport units and only
with the aid of the recommended transport equipment.
Do not stand under suspended loads.
Follow the transport instructions in these operating instructions carefully.
Perform the following steps to unpack the system:
Step Procedure
1
Remove outer packaging:
Transport
crate
Tensioning
straps
Cardboard, films and wooden parts
2
Undo fasteners holding the system parts on the pallet.
3
Lift system parts off the pallet with a crane, fork-lift truck or
hand lift (observe transport recommendations in
Transport-
ing the system in the company
on page 87).
Note:
The retractor must not be transported with a fork-lift
truck.
4
Dispose of packaging material in accordance with the na-
tional regulations.
5
Transport system parts to the place of installation (see
Transporting the system in the company
on page 87).
Mechanical and
material dangers
Heavy transport units
Instructions
Summary of Contents for SCK
Page 2: ......
Page 16: ......
Page 36: ......
Page 54: ......
Page 110: ......
Page 222: ......
Page 232: ......
Page 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Page 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Page 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Page 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Page 242: ......
Page 243: ......