Starting frequency converter and adapting control parameters
Risk of injury in the area of the gas sampling system due to moving or fall-
ing parts, hot surfaces, hot cooling water, anti-freeze, compressed air, lubri-
cating oil
Wear general personal protective equipment:
Closed overalls with long trousers and long sleeves
Safety shoes
Safety gloves suitable for mechanical work
Safety glasses
Protective helmet
If necessary, additional protective equipment if prescribed by the operator.
Danger of electric shock when control cabinet is open, open connection or
terminal boxes
Only specialized electrical personnel may work on the electrical system.
Observe national regulations pertaining to electrical equipment.
The frequency converter ACS355 controls the heat exchanger motor. In order to
ensure constant cooling-water temperature, the factory-set default control parame-
ters must be adapted to the conditions at the installation site.
Refer to the ACS355 manual for further information on operating the frequency
converter.
Control cabinet key to open the control cabinet
The following conditions must be met:
The service switch is in the
ON
position; the gas sampling probe is retracted from
the kiln (see
Operating the service switch
on page 159).
Mechanical, thermal
and material dangers
Current-carrying
components
Meaning
Tools required
Requirements
Summary of Contents for SCK
Page 2: ......
Page 16: ......
Page 36: ......
Page 54: ......
Page 110: ......
Page 222: ......
Page 232: ......
Page 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Page 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Page 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Page 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Page 242: ......
Page 243: ......