106
System Manual SCK Gas Sampling System
42/23-81 EN Rev. 4
Proceed as follows to connect internal electric lines:
Step Procedure
1
On the control cabinet: Turn off the main switch.
2
Install internal lines in accordance with the electrical connection
plan (see appendix). This applies to:
24 VDC control cabinet-cooling module line
230/400 VAC cable to cooling-water pump
230/400 VAC cable to heat exchanger fan motor
24 VDC cable to probe retractor
24/26/28/30 VAC cable to probe retractor (option "H")
230 VAC cable to probe heating (option "60S")
230 VAC cable to probe retractor
Signal cable to analyzer cabinet
System bus cable control cabinet - cooling module (see step 3)
System bus cable probe retractor - cooling module (see step 3)
3
Connecting the system bus cable:
Install system bus cable from control cabinet to cooling module
terminal box. Connect to the 9-pin D-Sub connector of the CAN
bridge
(1)
.
Install system bus cable from the probe retractor terminal box to
the cooling module terminal box. Connect to the 9-pin D-Sub
connector of the CAN bridge
(2)
.
4
Connecting the system bus cable to the frequency converter:
Loosen the short system bus cable with T-piece
(2)
from its
transport fixing and connect it to the CAN adapter
(1)
at the fre-
quency converter.
Instructions
Summary of Contents for SCK
Page 2: ......
Page 16: ......
Page 36: ......
Page 54: ......
Page 110: ......
Page 222: ......
Page 232: ......
Page 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Page 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Page 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Page 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Page 242: ......
Page 243: ......