42/23-81 EN Rev. 4
System Manual SCK Gas Sampling System
153
Diagram of the location of maintenance-relevant equipment on the control cabinet
(open left, closed right):
The following table lists the above-mentioned equipment:
Equipment ID
Designation
-H31
Warning buzzer
-F30
Residual current circuit breaker (for main switch; optional)
-F40
Residual current circuit breaker (for UPS; optional)
-F31
Service socket circuit breaker
-F32
Power supply circuit breaker 24V
-F33
Probe heating circuit breaker
-F34
Sample gas line/connection box/230 V valves heating
circuit breaker
-F35
Heat exchanger circuit breaker
-F36
Cooling-water pump circuit breaker
-F37
Cooling-water pump motor breaker
-S31
Service switch
-Q30
Main switch for normal voltage
-Q40
Main switch for UPS (optional)
Illustration
Equipment
Summary of Contents for SCK
Page 2: ......
Page 16: ......
Page 36: ......
Page 54: ......
Page 110: ......
Page 222: ......
Page 232: ......
Page 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Page 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Page 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Page 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Page 242: ......
Page 243: ......