42/23-81 EN Rev. 4
System Manual SCK Gas Sampling System
239
Index
A
About these operating instructions • 8
Access permissions • 49
Acquiring spare parts and wear parts • 155
Activation • 118
After switching on
working on the cooling module • 121
Anti-freeze • 114
Appendix • 233
B
Basic safety rules • 56
C
Checking for leaks • 171
Checking general condition • 140
Checking protective installations • 167
Checking site conditions • 93
Checking the condition of the system, cleaning the
system • 161
Checking the pneumatic system • 123
Checking the residual current circuit breaker • 165
Checking/correcting operating parameters • 127
Checks to perform when using probe H • 128
Cleaning gas sampling probe 60S • 144
Cleaning gas sampling probe H • 142
Cleaning procedures
Probe 60S • 30, 144
Probe H • 28, 142
Compressed-air tank and pneumatic system • 35
Connecting external electric cables • 107
Connecting internal electric cables • 105
Connecting the sample gas line to the retractor •
104
Controls and displays • 24
Cooling module • 32
Checking and topping up cooling water • 208
Vent the cooling-water circuit • 206
D
Default operating parameter settings • 50
Description of control system • 37
Description of the sampling system • 17
Dimensions and weights • 18
Disassembling the system • 227
Disposal • 231
Disposing of the system • 231
E
Electrical connection plan • 236
Emergency Stop • 146
Equipment layout plan • 152
Error message display • 48
Errors • 213
Errors and irregularities • 214
Evaluating trend displays • 164
G
Gas sampling probe 60S • 30
Cleaning or replacing the outlet filter • 184
Removing incrustations • 182
Replacing the seal set • 187
Gas sampling probe H • 28
Removing incrustations • 174
Replacing membrane pump membranes • 179
Replacing the intake filter • 176
General • 7
General transport information • 84
H
Handling error messages • 221
I
Inserting the probe and switching to automatic
mode • 131
Installation • 91
Installation check • 113
Summary of Contents for SCK
Page 2: ......
Page 16: ......
Page 36: ......
Page 54: ......
Page 110: ......
Page 222: ......
Page 232: ......
Page 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Page 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Page 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Page 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Page 242: ......
Page 243: ......