204
System Manual SCK Gas Sampling System
42/23-81 EN Rev. 4
Proceed as follow to readjust or reposition position indicator
-B71
:
Step Procedure
1
Press the Insert button to move the probe to the desired position.
Path:
Operation
►
Probe
►
Probe Action
►
Insert
2
Determine necessary position of the contact plate, mark with an pen.
3
Turn service switch to
ON
position.
WARNING!
Probe moves out of the kiln.
Do not stand in the area of
travel of the probe or probe carriage until the probe is complete-
ly retracted out of the kiln and the warning lamps go out.
4
Press EMERGENCY STOP switch.
5
Unscrew lock screws on the contact plate
(1)
with an Allen key and
push contact plate for inductive indicator
-B71
until it reaches the
marked position.
6
Unlock EMERGENCY STOP switch.
7
Turn service switch to
OFF
position, then turn back to ON.
8
Press the Insert button to move the probe to the desired position until
the controller displays the appropriate signal (e.g.:
Probe Inserted
display box in the
Probe Action
dialog changes from white to black).
Note:
If inductive indicator
-B71
does not trigger despite the contact
plate above it, check the height adjustment and adjust as necessary.
The distance between the inductive indicator and the contact plate
must be 3-6 mm.
9
Tighten contact sheet with Allen key.
10
Unlock EMERGENCY STOP switch, turn service switch back to
OFF
position and insert probe again using the controller.
WARNING!
Probe moves into the kiln.
Do not stand in the area of
travel of the probe or probe carriage until the probe is complete-
ly inserted into the kiln and the warning lamps go out.
Instructions: probe
inserted position
Summary of Contents for SCK
Page 2: ......
Page 16: ......
Page 36: ......
Page 54: ......
Page 110: ......
Page 222: ......
Page 232: ......
Page 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Page 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Page 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Page 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Page 242: ......
Page 243: ......