Checking site conditions
Risk of injury in the area of the gas sampling system due to moving or fall-
ing parts, hot surfaces, anti-freeze, compressed air, lubricating oil
Wear general personal protective equipment:
Closed overalls with long trousers and long sleeves
Safety shoes
Safety gloves suitable for mechanical work
Safety glasses
Protective helmet
If necessary, additional protective equipment if prescribed by the operator.
The purpose of this task is to check whether the gas sampling system site is cor-
rectly prepared.
How to check site conditions:
Step Procedure
1
Using the checklist, check whether the site conditions for the vari-
ous modules of the gas sampling system are fulfilled and that prep-
arations for installation have been completed.
2
Only continue with installation of the gas sampling system once all
conditions have been met.
The following conditions must be met:
Conditions
Description in the
"Engineering Guideline" in ...
OK
General rules regarding choice
of installation site were ob-
served, environmental conditions
taken into account.
General rules regarding choosing
the place of installation of the pe-
ripheral modules
Environmental condition require-
ments
Installation position of probe and
probe retractor defined.
Positioning the gas sampling probe
There is a suitable position to
install the control cabinet with an
unobstructed view of the probe
retractor.
Choosing the place of installation of
the control cabinet
Position to set up the cooling
module defined.
Choosing the place of installation of
the cooling module
If a compressed-air tank is re-
quired: Position to set up the
compressed-air tank defined.
Choosing the place of installation of
the compressed-air tank
A suspension device for the
probe retractor has been pre-
pared and holes drilled for instal-
lation of the other modules.
Fastening elements and attachment
points
Mechanical, thermal
and material dangers
Meaning
Instructions
Site conditions
checklist
Summary of Contents for SCK
Page 2: ......
Page 16: ......
Page 36: ......
Page 54: ......
Page 110: ......
Page 222: ......
Page 232: ......
Page 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Page 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Page 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Page 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Page 242: ......
Page 243: ......