Installing the probe retractor
Risk of injury in the area of the gas sampling system due to moving or fall-
ing parts, hot surfaces, anti-freeze, compressed air, lubricating oil
Wear general personal protective equipment:
Closed overalls with long trousers and long sleeves
Safety shoes
Safety gloves suitable for mechanical work
Safety glasses
Protective helmet
If necessary, additional protective equipment if prescribed by the operator.
Danger of crushing when lifting or lowering the transport unit
Only appropriately trained personnel may transport the transport units and only
with the aid of the recommended transport equipment.
Do not stand under suspended loads.
Follow the transport instructions in these operating instructions carefully.
Risk of burning due to jet flames and hot gases at the uncovered duct open-
ing when the rotary kiln is in operation.
Preferably install or remove the probe when the rotary kiln is out of operation.
If you install or remove the probe when the rotary kiln is in operation:
Wear a face mask against heat, heat-proof gloves and protective welder's
clothing and respiratory protection against toxic gases.
Keep the time in which the duct opening is open as short as possible.
6 suspension bolts, diameter 16 mm, material round steel S235JR (St37)
The following requirements must be met in order to install the probe retractor:
The site conforms to the designated site conditions (criteria see
Choosing the
place of installation of the peripheral modules
).
6 fastening points are present to affix the probe retractor.
The probe retractor is unpacked.
How to install the probe retractor:
Step Procedure
1
Set up probe retractor at the place of installation.
Mechanical, thermal
and material dangers
Heavy transport units
Hot surfaces, hot
gases, jet flames
Screws required for
assembly
Requirements
Instructions:
Installing the probe
retractor
Summary of Contents for SCK
Page 2: ......
Page 16: ......
Page 36: ......
Page 54: ......
Page 110: ......
Page 222: ......
Page 232: ......
Page 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Page 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Page 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Page 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Page 242: ......
Page 243: ......