148
System Manual SCK Gas Sampling System
42/23-81 EN Rev. 4
Maintenance plan
This section gives an overview of maintenance work to be performed at regular
intervals. The tasks described here require special training and under some cir-
cumstances involve working on control cabinet open and powered on. They must
therefore only be carried out by qualified and specially trained persons.
If it can be assumed that safe operation is no longer possible, the gas sampling
system must be taken out of operation and secured against being started up again
unintentionally.
It can be assumed that safe operation is no longer possible:
if the gas sampling system is visibly damaged,
if a check reveals problems,
if the gas sampling system no longer works,
after prolonged storage in adverse conditions,
after severe transport stress.
It is recommended to have the gas sampling system maintained by the ABB repre-
sentative responsible for you.
When performing maintenance work on the gas sampling system, the service
switch must be in the
ON
position with a few exceptions (for example, when check-
ing the EMERGENCY STOP switch). Actuating the service switch automatically
retracts the gas sampling probe out of the kiln, and the controller displays the
Maintenance
message. See Chapter
Operating the service switch
on page 159 for
more details.
You can secure the service switch with a padlock to prevent unintentionally restart-
ing the gas sampling system.
Introduction
Service switch
Unintentional restart
Summary of Contents for SCK
Page 2: ......
Page 16: ......
Page 36: ......
Page 54: ......
Page 110: ......
Page 222: ......
Page 232: ......
Page 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Page 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Page 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Page 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Page 242: ......
Page 243: ......