Checks to perform when using probe H
Danger of electric shock when control cabinet is open, open connection or
terminal boxes
Only specialized electrical personnel may work on the electrical system.
Observe national regulations pertaining to electrical equipment.
In addition to the usual checks when starting up the probe for the first time, addi-
tional checks are required when using probe H.
These are:
Checking current monitoring relay settings
Checking probe H heating power supply
The following illustration shows the position of current monitoring relays
-K35
and
-
K36
in the control cabinet:
Control cabinet key to open the control cabinet
The following conditions must be met:
The service switch is in the
ON
position, the gas sampling probe is retracted from
the kiln (see
Operating the service switch
on page 159).
Current-carrying
components
Meaning
Position
Tools required
Requirements
Summary of Contents for SCK
Page 2: ......
Page 16: ......
Page 36: ......
Page 54: ......
Page 110: ......
Page 222: ......
Page 232: ......
Page 235: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 235 ...
Page 236: ...236 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Electrical connection plan ...
Page 237: ...42 23 81 EN Rev 4 System Manual SCK Gas Sampling System 237 ...
Page 238: ...238 System Manual SCK Gas Sampling System 42 23 81 EN Rev 4 Transformer connection plan ...
Page 242: ......
Page 243: ......