background image

MAGUIRE PRODUCTS INC. 

 MLS Clear Vu

 

Model MLS Clear Vu

 

Eight Component Vacuum Loading System

 

 

INSTALLATION 

  OPERATION 

  MAINTENANCE 

 

 

 

 

Original Instructions Manual 

Revision Date: March 31, 2021 

Copyright 

©

 Maguire Products, Inc. 2021 

 

 

 
  

 

Summary of Contents for MLS Clear Vu

Page 1: ...RODUCTS INC MLS Clear Vu Model MLS Clear Vu Eight Component Vacuum Loading System INSTALLATION OPERATION MAINTENANCE Original Instructions Manual Revision Date March 31 2021 Copyright Maguire Products...

Page 2: ...Maguire Products Inc 2 MLS Clear Vu...

Page 3: ...ccepts no responsibility or liability for damage or malfunction of the equipment arising from non observance of these operating instructions To avoid errors and to ensure trouble free operation it is...

Page 4: ...manual to be entirely accurate If you question any information in this manual or find errors please let us know so that we may make the required corrections or provide you with accurate information Ad...

Page 5: ...aterial Mix 16 Receiver Load Time 16 Filter 16 2 4 Troubleshooting 18 2 5 Mechanical Adjustments 18 2 6 Setup Options Summary List 19 2 7 Setup Options Detailed Explanation 20 2 8 MLS Alarm Lights Exp...

Page 6: ...ect wiring by others or installation or use not in accord with instructions furnished by Maguire Products Inc Our liability under this warranty will extend only to equipment that is returned to our fa...

Page 7: ...each receiver are the only items that raise a safety concern The air cylinders exert a force of about 70 pounds on closing DO NOT reach into this area when cleaning the receiver or from below when cle...

Page 8: ...uum and material line using 1 5 2 or 2 5 tubing steel aluminum or PVC and tees and elbows as required 1 RECEIVERS Mount receivers over the hopper compartments you wish to load Receivers are sized to f...

Page 9: ...Maguire Products Inc 9 MLS Clear Vu...

Page 10: ...Maguire Products Inc 10 MLS Clear Vu...

Page 11: ...Maguire Products Inc 11 MLS Clear Vu...

Page 12: ...Maguire Products Inc 12 MLS Clear Vu...

Page 13: ...volt single phase blower motors have automatic overheat protection and will stop operating if they become too hot due to an inadequate power supply If you experience this problem read SETUP OPTIONS Ro...

Page 14: ...and the power station both require air pressure to operate When mounted on a Weigh Scale Blender receivers can get their air supply from the extra pressure gauge port on the blender s air pressure reg...

Page 15: ...acuum lines REMEMBER Performance is reduced by Inadequate diameter line Longer length lines Elbows and corrugated flex tubing Restrictions or neck down points Clogged filters Vacuum leaks LOADING BESI...

Page 16: ...r if necessary Stations NOT connected to receivers will light but will NOT start the blower OPERATION 1 Turn power ON 2 Turn on each station you wish to load The controller will sequence through all s...

Page 17: ...en filter The filter s in the power station traps all dust before it can reach the vacuum pump To check filter 1 Turn Controller power OFF to stop blower motor 2 Open the door on the front of the Filt...

Page 18: ...T significantly reduce conveying rate Stations simply load more frequently 7 Excessive high vacuum will overheat the blower A thermal switch is provided in the exhaust air steam which trips out at 190...

Page 19: ...ches 1 7 and 8 on designate Follower ROUTINE 3 Disable Enable Alarm Selected Stations Select Stations to ALARM Press SET TIMER ROUTINE 4 Delay the Retry Time Selected Stations Select Stations to chang...

Page 20: ...n turn POWER ON Hold for 3 seconds while all lights blink rapidly Release when blinking stops Turn ON all stations you want to reset Turn OFF all stations you want unchanged Press and hold SET LOAD TI...

Page 21: ...OFF all stations you do NOT want to alarm Press and hold SET LOAD TIME button for 1 second All lights will flash and then go off Release button to resume normal operation ROUTINE 4 Delay the retry tim...

Page 22: ...he next time all stations are satisfied the blower will keep running This is due to anticipation that the blower will be called on again within the time period Therefore it is kept running By the same...

Page 23: ...urn STATION 6 switch ON all others OFF While pressing SET LOAD TIME button turn POWER ON Hold for 3 seconds while all lights blink rapidly Release when blinking stops For switch numbers 1 2 3 4 5 6 7...

Page 24: ...row 3478 This normally indicates that the filters are not installed properly Turn power off and fix the problem 2 After power has been turned on and filter circuit was present at anytime the filter c...

Page 25: ...Maguire Products Inc 25 MLS Clear Vu MLS Alarm Lights Explained...

Page 26: ...N This kit allows a dual MAIN FOLLOWER controller setup in which the customer can piggyback a second controller to their existing Maguire Loading System to allow a total of 16 receiver outputs Include...

Page 27: ...ntil behind controller and still be connected to strobe light B Remove 2 screws fastening endplate to base C Remove 3 screws on bottom of base fastening front face to controller Tilt front face down f...

Page 28: ...LLOW end of the DB9 cable supplied in the kit into the DB9 connector on the endplate D Reconnect the correct receiver cables to the back of the controller 8 Install FOLLOWER controller on right try A...

Page 29: ...D Hold for 3 seconds while all lights blink rapidly E Release when blinking stops 10 To enter address of MAIN controller note that Main controller should already have this address A Turn ON switches...

Page 30: ...2 Hex Nut 1 4 20 snn4 4 Nylok Nut 1 4 20 DESCRIPTION This kit allows a dual Main Follower controller setup in which the customer can piggyback a second controller to their existing Maguire Loading Sy...

Page 31: ...til behind controller and still be connected to strobe light B Remove 2 screws fastening endplate to base C Remove 3 screws on bottom of base fastening front face to controller Tilt front face down fo...

Page 32: ...2 20 Install MAIN controller on bottom tray A Plug power cord into motor starter box B Reconnect VACUUM MOTOR cord to connector in endplate C Plug in the YELLOW end of the DB9 cable supplied in the ki...

Page 33: ...ld for 3 seconds while all lights blink rapidly E Release when blinking stops F Now go to 12 for Main or 13 for Follower 23 To enter address of MAIN controller note that main controller should already...

Page 34: ...NCE BUTTON The silence button silences the alarm until any new event starts it up again The covering of the sensor of an alarming station will also silence the alarm unless another station is also in...

Page 35: ...Maguire Products Inc 35 MLS Clear Vu...

Page 36: ...Maguire Products Inc 36 MLS Clear Vu...

Page 37: ...Maguire Products Inc 37 MLS Clear Vu...

Page 38: ...610 459 2700 Email info maguire com Web www maguire com Maguire Europe Tame Park Tamworth Staffordshire B775DY UK Tel 44 1827 265 850 Fax 44 1827 265 855 Email info maguire europe com Maguire Product...

Reviews: