
Verifying the settings.................................................................. 143
Testing the power swing detection function ZMRPSB (68)........ 144
Testing the
tR1 timer.................................................................. 144
Testing the block input, interaction between FDPSPDIS (21)
Power swing logic PSLPSCH.......................................................... 145
Testing the carrier send and trip signals.....................................146
Testing the influence of the residual overcurrent protection.......146
Checking the underreaching zone..............................................147
Completing the test.....................................................................148
Pole slip protection PSPPPAM (78)................................................ 148
Verifying the settings.................................................................. 148
Completing the test.....................................................................150
Out-of-step protection OOSPPAM...................................................150
Verifying the settings.................................................................. 151
Test of point RE (R
)................................................. 156
Test of the boundary between zone 1 and zone 2, which is
ReachZ1............................................161
).............................................165
Automatic switch onto fault logic ZCVPSOF................................... 170
Activating ZCVPSOF externally..................................................170
Initiating ZCVPSOF automatically and setting mode to
Phase preference logic PPLPHIZ ...................................................172
Completing the test.....................................................................173
Under impedance protection for Generator ZGVPDIS.................... 173
Verifying the settings.................................................................. 173
Completing the test.....................................................................176
Instantaneous phase overcurrent protection 3-phase output
PHPIOC (50)....................................................................................177
Measuring the trip limit of set values.......................................... 177
Completing the test.....................................................................178
Directional phase overcurrent protection, four steps OC4PTOC
Verifying the settings.................................................................. 178
Completing the test.....................................................................180
Table of contents
Transformer protection RET670 2.2 ANSI
5
Commissioning manual
Summary of Contents for RELION RET670
Page 1: ...RELION 670 SERIES Transformer protection RET670 Version 2 2 ANSI Commissioning manual...
Page 2: ......
Page 18: ...12...
Page 34: ...28...
Page 66: ...60...
Page 76: ...70...
Page 94: ...88...
Page 110: ...104...
Page 292: ...286...
Page 302: ...296...
Page 308: ...302...
Page 326: ...320...
Page 327: ...321...