Apply input signals as needed according to the actual hardware and the
application configuration.
1.
Inject a symmetrical three-phase voltage and current at rated value.
2.
Compare the injected value with the measured values.
The voltage and current phasor menu in the local HMI is located under
Main menu/
Measurements/Analog primary values
and
Main menu/Measurements/Analog
secondary values
.
3.
Compare the frequency reading with the set frequency and the direction of the
power.
The frequency and active power are located under
Main menu/Measurements/
Monitoring/ServiceValues(MMXN)/CVMMXN:x
. Then navigate to the bottom
of the list to find the frequency.
4.
Inject an unsymmetrical three-phase voltage and current, to verify that phases are
correctly connected.
If some setting deviates, check the analog input settings under
Main menu/Configuration/Analog modules
If the IEC/UCA 61850-9-2LE communication is interrupted during
current injection, the report tool in PCM600 will display the current that
was injected before the interruption.
1MRK 504 165-UUS -
Section 10
Testing IED operation
Transformer protection RET670 2.2 ANSI
95
Commissioning manual
Summary of Contents for RELION RET670
Page 1: ...RELION 670 SERIES Transformer protection RET670 Version 2 2 ANSI Commissioning manual...
Page 2: ......
Page 18: ...12...
Page 34: ...28...
Page 66: ...60...
Page 76: ...70...
Page 94: ...88...
Page 110: ...104...
Page 292: ...286...
Page 302: ...296...
Page 308: ...302...
Page 326: ...320...
Page 327: ...321...