11.5.15.2
Completing the test
Continue to test another function or end the test by changing the
TESTMODE
setting to
Disabled
. Restore connections and settings to their original values, if they were changed
for testing purposes.
11.6
Voltage protection
11.6.1
Two step undervoltage protection UV2PTUV (27)
Prepare the IED for verification of settings outlined in Section
11.6.1.1
Verifying the settings
Verification of pickup value and time delay to trip for Step 1
1.
Check that the IED settings are appropriate, especially the PICKUP value, the
definite time delay and the
1 out of 3
operation mode.
2.
Supply the IED with three-phase voltages at their rated values.
3.
Slowly decrease the voltage in one of the phases, until the PICKUP signal appears.
4.
Note the trip value and compare it with the set value.
The trip value in secondary volts is calculated according to the
following equations:
For phase-to-ground measurement:
sec
100
3
Vpickup
VBase
VT
VTprim
<
´
´
ANSIEQUATION2430 V1 EN
(Equation 96)
For phase-to-phase measurement:
sec
100
Vpickup
VT
VBase
VTprim
<
´
´
ANSIEQUATION2431 V1 EN
(Equation 97)
5.
Increase the measured voltage to rated load conditions.
6.
Check that the PICKUP signal resets.
7.
Instantaneously decrease the voltage in one phase to a value about 20% lower than
the measured trip value.
8.
Measure the time delay for the TRIP signal, and compare it with the set value.
Section 11
1MRK 504 165-UUS -
Testing functionality by secondary injection
212
Transformer protection RET670 2.2 ANSI
Commissioning manual
Summary of Contents for RELION RET670
Page 1: ...RELION 670 SERIES Transformer protection RET670 Version 2 2 ANSI Commissioning manual...
Page 2: ......
Page 18: ...12...
Page 34: ...28...
Page 66: ...60...
Page 76: ...70...
Page 94: ...88...
Page 110: ...104...
Page 292: ...286...
Page 302: ...296...
Page 308: ...302...
Page 326: ...320...
Page 327: ...321...