11.5.2.2
Completing the test
Continue to test another function or end the test by changing the
TESTMODE
setting to
Disabled
. Restore connections and settings to their original values, if they were changed
for testing purposes.
11.5.3
Instantaneous residual overcurrent protection EFPIOC (50N)
Prepare the IED for verification of settings outlined in Section
Values of the logical signals for EFPIOC are available on the local HMI under
Main
menu/Tests/Function status/Current protection/
InstResidualOverCurrent(50N,IN>>)/EFPIOC(50N;IN>>):x
, where x = 1, 2, and 3.
The Signal Monitoring in PCM600 shows the same signals that are available on the local
HMI.
To verify the settings the following fault type should be tested:
•
Phase-to-ground fault
Ensure that the maximum continuous current, supplied from the current source used for
the test of the IED, does not exceed four times the rated current value of the IED.
11.5.3.1
Measuring the trip limit of set values
1.
Inject a phase current into the IED with an initial value below the set value of
IN>>
and also make sure that the set value
IN>>
is in between
IN>>Min
and
IN>>Max
.
2.
Increase the injected current in the Ln or in the neutral (summated current input)
phase until the TRIP signal appears.
3.
Disable the fault current
Do not exceed the maximum permitted overloading of the current
circuits in the IED.
4.
Compare the measured operating current with the set value.
Section 11
1MRK 504 165-UUS -
Testing functionality by secondary injection
180
Transformer protection RET670 2.2 ANSI
Commissioning manual
Summary of Contents for RELION RET670
Page 1: ...RELION 670 SERIES Transformer protection RET670 Version 2 2 ANSI Commissioning manual...
Page 2: ......
Page 18: ...12...
Page 34: ...28...
Page 66: ...60...
Page 76: ...70...
Page 94: ...88...
Page 110: ...104...
Page 292: ...286...
Page 302: ...296...
Page 308: ...302...
Page 326: ...320...
Page 327: ...321...