11.4.12.3
Test of the boundary between zone 1 and zone 2, which is defined by the
parameter
ReachZ1
The trajectory of the impedance traverses the lens characteristic in zone 2
Preliminary steady state test at 50 Hz
•
Go to
Main menu/Test/Function status/Impedance protection/
OutOfStep(78,Ucos)/OOSPPAM(78,Ucos):1/Outputs
to check the available
service values of the function block OOSPPAM.
•
Apply the following three-phase symmetrical quantities (the phase angle is related to
phase L1):
V
V
V
V
V
ts
t RZ
VT s
VT p
=
×
×
=
×
×
=
1 1
1 1 1435
0 1
13 8
11 44
1
.
.
.
.
.
,
,
,
EQUATION14065 V1 EN
(Equation 37)
∠
=
=
=
V
ForwardX
ForwardR
ts
arctan
arctan
.
.
59 33
8 19
82..14
°
EQUATION14058 V1 EN
(Equation 38)
frequency of V
ts
= 50 Hz
I
I
I
I
A
s
CTs
CTp
50
50
10459
1
9000
1 162
=
×
=
×
=
.
EQUATION14059 V1 EN
(Equation 39)
∠
I
50s
= 0º
frequency of I
50s
= 50 Hz
It
I
I
I
A
fs
CTs
CTp
tf
=
×
=
×
=
10459
1
9000
1 162
.
EQUATION14062 V1 EN
(Equation 40)
∠
I
tfs
= 0º
frequency of I
tfs
= 50 Hz
•
Check that the service values (VOLTAGE, CURRENT, R(%), X(%)) are according
to the injected quantities and that ROTORANG is close to 3.14 rad. For this particular
injection the service values are:
•
VOLTAGE = 1.58 kV
•
CURRENT = 20918 A
•
R = 1.08%
•
X = 7.85%
•
ROTORANG = -3.04 rad
1MRK 504 165-UUS -
Section 11
Testing functionality by secondary injection
Transformer protection RET670 2.2 ANSI
161
Commissioning manual
Summary of Contents for RELION RET670
Page 1: ...RELION 670 SERIES Transformer protection RET670 Version 2 2 ANSI Commissioning manual...
Page 2: ......
Page 18: ...12...
Page 34: ...28...
Page 66: ...60...
Page 76: ...70...
Page 94: ...88...
Page 110: ...104...
Page 292: ...286...
Page 302: ...296...
Page 308: ...302...
Page 326: ...320...
Page 327: ...321...