Section 6
Checking the external optical and
electrical connections
About this chapter
This chapter describes what to check to ensure correct connection to the external
circuitry, such as the auxiliary power supply, CT’s and VT’s. These checks must be
made with the protection IED de-energized.
6.1
Overview
The user must check the installation which includes verifying that the IED is
connected to the other parts of the protection system. This is done with the IED and
all connected circuits de-energized.
6.2
Checking VT circuits
Check that the wiring is in strict accordance with the supplied connection diagram.
Correct possible errors before continuing to test the circuitry.
Test the circuitry.
•
Polarity check
•
VT circuit voltage measurement (primary injection test)
•
Earthing check
•
Phase relationship
•
Insulation resistance check
The polarity check verifies the integrity of circuits and the phase relationships. The
check must be performed as close to the IED as possible.
The primary injection test verifies the VT ratio and the wiring all the way from the
primary system to the IED. Injection must be performed for each phase-to-neutral
circuit and each phase-to-phase pair. In each case, voltages in all phases and
neutral are measured.
1MRK 502 029-UEN A
Section 6
Checking the external optical and electrical connections
87
Installation and commissioning manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 92: ...86...
Page 96: ...90...
Page 102: ...96...
Page 108: ...102...
Page 112: ...106...
Page 126: ...120...
Page 140: ...134...
Page 150: ...144...
Page 234: ...228...
Page 238: ...232...
Page 250: ...244...
Page 259: ...253...