Verifying settings by secondary injection.............................189
Completing the test..............................................................190
Accidental energizing protection for synchronous generator
AEGGAPC.................................................................................191
Verifying the settings............................................................191
Voltage protection...........................................................................191
Two step undervoltage protection UV2PTUV ...........................191
Verifying the settings............................................................191
Completing the test..............................................................192
Two step overvoltage protection OV2PTOV .............................192
Two step residual overvoltage protection ROV2PTOV ............193
Overexcitation protection OEXPVPH .......................................193
Verifying the settings............................................................193
Completing the test..............................................................194
Voltage differential protection VDCPTOV .................................194
Check of undervoltage levels...............................................194
Check of voltage differential trip and alarm levels................196
Check of trip and trip reset timers........................................197
Final adjustment of compensation for VT ratio
100% Stator earth fault protection, 3rd harmonic based
STEFPHIZ ................................................................................198
Testing..................................................................................199
Verifying settings..................................................................200
Completing the test..............................................................201
Frequency protection......................................................................201
Underfrequency protection SAPTUF ........................................201
Verifying the settings............................................................201
Completing the test..............................................................202
Overfrequency protection SAPTOF ..........................................202
Verifying the settings............................................................202
Completing the test..............................................................203
Rate-of-change frequency protection SAPFRC ........................203
Verifying the settings............................................................203
Completing the test..............................................................204
Multipurpose protection..................................................................204
General current and voltage protection CVGAPC.....................204
Built-in overcurrent feature (non-directional)........................204
Overcurrent feature with current restraint.............................205
Table of contents
7
Installation and commissioning manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 92: ...86...
Page 96: ...90...
Page 102: ...96...
Page 108: ...102...
Page 112: ...106...
Page 126: ...120...
Page 140: ...134...
Page 150: ...144...
Page 234: ...228...
Page 238: ...232...
Page 250: ...244...
Page 259: ...253...