xx04000310.vsd
t (s)
0
55
90
1
3
2
IEC04000310 V1 EN
Figure 58:
Typical IED start-up sequence
1 IED energized. Green LED instantly starts flashing
2 LCD lights up and "IED startup" is displayed
3 The main menu is displayed. A steady green light indicates a successful startup.
If the upper row in the window indicates ‘Fail’ instead of ‘Ready’ and the green
LED flashes, an internal failure in the IED has been detected. See
"Checking the self supervision function"
in this chapter to investigate the fault.
An example of the local HMI is shown in figure
.
7.3
Design
The different parts of the medium size local HMI are shown in figure
. The local
HMI exists in an IEC version and in an ANSI version. The difference is on the
keypad operation buttons and the yellow LED designation.
Section 7
1MRK 502 029-UEN A
Energizing the IED and REX060
92
Installation and commissioning manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 92: ...86...
Page 96: ...90...
Page 102: ...96...
Page 108: ...102...
Page 112: ...106...
Page 126: ...120...
Page 140: ...134...
Page 150: ...144...
Page 234: ...228...
Page 238: ...232...
Page 250: ...244...
Page 259: ...253...