4.
Close the switch to the station earth and check that the trip from the rotor
earth fault will be given after the set delay time.
5.
Open the switch to the station earth and check that the trip signal resets
instantaneously.
6.
Connect an adjustable resistor to the field circuit (221 on RXTTE4). Decrease
this resistor from a large value until the function operates and check
monitored value
ICOSFI
.
When the generator has been started the service value of injection voltage and
injection current shall be checked so that there is no risk for unwanted trip
due to large capacitive detected current.
15.9.2.2
Completing the test
Continue to test another function or end the test by changing the
Test mode
setting
to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
15.10
Secondary system supervision
15.10.1
Current circuit supervision CCSRDIF
Prepare the IED for verification of settings outlined in section
and
in this chapter.
The Current circuit supervision function CCSRDIF is conveniently tested with the
same three-phase test set as used when testing the measuring functions in the IED.
The condition for this procedure is that the setting of
IMinOp
is lower than the
setting of
Ip>Block
.
15.10.1.1
Verifying the settings
1.
Check the input circuits and the operate value of the
IMinOp
current level
detector by injecting current, one phase at a time.
2.
Check the phase current blocking function for all three phases by injection
current, one phase at a time. The output signals shall reset with a delay of 1
second when the current exceeds 1.5 ·
IBase
.
3.
Inject a current 0.9 ·
IBase
to phase L1 and a current 0.15 ·
IBase
to the
reference current input I5.
4.
Decrease slowly the current to the reference current input and check that
blocking is obtained when the current is about 0.1 ·
IBase
.
1MRK 502 029-UEN A
Section 15
Verifying settings by secondary injection
209
Installation and commissioning manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 92: ...86...
Page 96: ...90...
Page 102: ...96...
Page 108: ...102...
Page 112: ...106...
Page 126: ...120...
Page 140: ...134...
Page 150: ...144...
Page 234: ...228...
Page 238: ...232...
Page 250: ...244...
Page 259: ...253...