5.3.5.2
Mounting procedure for side-by-side rack mounting
xx04000456.vsd
3
4
1
2
IEC04000456 V1 EN
Figure 15:
Side-by-side rack mounting details.
PosNo
Description
Quantity
Type
1
Mounting plate
2
-
2, 3
Screw
16
M4x6
4
Mounting angle
2
-
Procedure
1.
Place the two IEDs next to each other on a flat surface.
2.
Fasten a side-by-side mounting plate (1).
Use four of the delivered screws (2, 3).
3.
Carefully turn the two IEDs up-side down.
4.
Fasten the second side-by-side mounting plate.
Use the remaining four screws.
5.
Carefully fasten the mounting angles (4) to the sides of the IED.
Use the screws available in the mounting kit.
6.
Place the IED assembly in the rack.
7.
Fasten the mounting angles with appropriate screws.
5.3.5.3
IED in the 670 series mounted with a RHGS6 case
An 1/2 x 19” or 3/4 x 19” size IED can be mounted with a RHGS (6 or 12
depending on IED size) case. The RHGS case can be used for mounting a test
switch of type RTXP 24. It also has enough space for a terminal base of RX 2 type
for mounting of, for example, a DC-switch or two trip IEDs.
1MRK 502 029-UEN A
Section 5
Installing the IED
39
Installation and commissioning manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 92: ...86...
Page 96: ...90...
Page 102: ...96...
Page 108: ...102...
Page 112: ...106...
Page 126: ...120...
Page 140: ...134...
Page 150: ...144...
Page 234: ...228...
Page 238: ...232...
Page 250: ...244...
Page 259: ...253...