1. Switch off the dc supply.
2. Short-circuit the current transformers and disconnect all current and voltage
connections from the IED.
3. Disconnect all signal wires by removing the female connectors.
4. Disconnect the optical fibers.
5. Unscrew the main back plate of the IED.
6. If the transformer module is to be changed:
•
Remove the IED from the panel if necessary.
•
Remove the rear plate of the IED.
•
Remove the front plate.
•
Remove the screws of the transformer input module, both front and rear.
7. Pull out the faulty module.
8. Check that the new module has a correct identity number.
9. Check that the springs on the card rail are connected to the corresponding
metallic area on the circuit board when the new module is inserted.
10. Reassemble the IED.
If the IED has been calibrated with the system inputs, the calibration procedure
must be performed again to maintain the total system accuracy.
18.3
Repair support
If an IED needs to be repaired, the whole IED must be removed and sent to an
ABB Logistic Center. Before returning the material, an inquiry must be sent to the
ABB Logistic Center.
e-mail: [email protected]
18.4
Maintenance
The IED is self-supervised. No special maintenance is required.
Instructions from the power network company and other maintenance directives
valid for maintenance of the power system must be followed.
1MRK 502 029-UEN A
Section 18
Fault tracing and repair
243
Installation and commissioning manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 92: ...86...
Page 96: ...90...
Page 102: ...96...
Page 108: ...102...
Page 112: ...106...
Page 126: ...120...
Page 140: ...134...
Page 150: ...144...
Page 234: ...228...
Page 238: ...232...
Page 250: ...244...
Page 259: ...253...