setting parameters and technical data sorted per function. The technical reference
manual should be used as a technical reference during the engineering phase,
installation and commissioning phase, and during normal service.
The Installation and Commissioning Manual (ICM)
contains instructions on
how to install and commission the protection IED. The manual can also be used as
a reference during periodic testing. The manual covers procedures for mechanical
and electrical installation, energizing and checking of external circuitry, setting and
configuration as well as verifying settings and performing directional tests. The
chapters are organized in the chronological order (indicated by chapter/section
numbers) in which the protection IED should be installed and commissioned.
The Operator’s Manual (OM)
contains instructions on how to operate the
protection IED during normal service once it has been commissioned. The
operator’s manual can be used to find out how to handle disturbances or how to
view calculated and measured network data in order to determine the cause of a fault.
The Engineering Manual (EM)
contains instructions on how to engineer the IEDs
using the different tools in PCM600. The manual provides instructions on how to
set up a PCM600 project and insert IEDs to the project structure. The manual also
recommends a sequence for engineering of protection and control functions, LHMI
functions as well as communication engineering for IEC 61850 and DNP3.
1.1.2
About the installation and commissioning manual
The installation and commissioning manual contains the following chapters:
•
presents warning and note signs, that the user
should pay attention to.
•
is a summary of the major tasks faced when installing
and commissioning an IED.
•
Unpacking and checking the IED
explains how to take delivery of
the IED.
•
explains how to install the IED.
•
Checking the external optical and electrical connections
how to check that the IED is properly connected to the protection system.
•
explains how to start the IED.
•
Set up PCM 600 communication link per IED
describes the
communication between PCM600 and the IED.
•
Establishing connection and verifying the SPA/IEC-
contains explains how to enter SPA/IEC settings and
verifying the communication.
•
Establishing connection and verifying the LON communication
contains a reference to another document.
•
Establishing connection and verifying the IEC 61850
contains explains how to enter IEC 61850 settings and
verifying the communication.
•
Configuring the IED and changing settings
” explains how to
write settings and configure the IED.
Section 1
1MRK 502 029-UEN A
Introduction
12
Installation and commissioning manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 92: ...86...
Page 96: ...90...
Page 102: ...96...
Page 108: ...102...
Page 112: ...106...
Page 126: ...120...
Page 140: ...134...
Page 150: ...144...
Page 234: ...228...
Page 238: ...232...
Page 250: ...244...
Page 259: ...253...