Figure 99:
Connection of the test set to the IED for test of alarm levels,
trip levels and trip timer
where:
1
is three-phase voltage group1 (U1)
2
is three-phase voltage group2 (U2)
2.
Apply 1.2 · Ur (rated voltage) to the U1 and U2 inputs.
3.
Decrease slowly the voltage of in phase UL1 of the test set until the ALARM
signal is activated.
The ALARM signal is delayed with timer
tAlarm
4.
Check the alarm operation level by comparing the differential voltage level at
ALARM with the set alarm level
UDAlarm
.
5.
Continue to slowly decrease the voltage until START signal is activated.
6.
Check the differential voltage operation level by comparing the differential
voltage level at START with the set trip level
UDTrip
.
7.
to check the other phases.
Observe that the connections to U1 must be shifted to test another phase.
(UL1 to UL2, UL2 to UL3, UL3 to UL1)
15.7.5.3
Check of trip and trip reset timers
Procdure
1MRK 502 029-UEN A
Section 15
Verifying settings by secondary injection
197
Installation and commissioning manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 92: ...86...
Page 96: ...90...
Page 102: ...96...
Page 108: ...102...
Page 112: ...106...
Page 126: ...120...
Page 140: ...134...
Page 150: ...144...
Page 234: ...228...
Page 238: ...232...
Page 250: ...244...
Page 259: ...253...