15.6.6.2
Completing the test
Continue to test another function or end the test by changing the
Test mode
setting
to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
15.6.7
Thermal overload protection, two time constants TRPTTR
Prepare the IED for verification of settings outlined in section
and
in this chapter.
15.6.7.1
Checking operate and reset values
1.
Connect symmetrical three-phase currents to the appropriate current terminals
of the IED.
2.
Set the Time constant 1 (
Tau1
) and Time Constant 2 (
Tau2
) temporarily to 1
minute.
3.
Set the three-phase injection currents slightly lower than the set operate value
of stage
IBase1
, increase the current in phase L1 until stage
IBase1
operates
and note the operate value.
Observe the maximum permitted overloading of the current
circuits in the IED.
4.
Decrease the current slowly and note the reset value.
Check in the same way as the operate and reset values of
IBase1
for phases
L2 and L3.
5.
Activate the digital input for cooling input signal to switch over to base
current
IBase2
.
6.
Check for all three phases the operate and reset values for
IBase2
in the same
way as described above for stage
IBase1
7.
Deactivate the digital input signal for stage
IBase2
.
8.
Set the time constant for
IBase1
in accordance with the setting plan.
9.
Set the injection current for phase L1 to 1.50 ·
IBase1
.
10. Connect a trip output contact to the timer and monitor the output of contacts
ALARM1 and ALARM2 to digital inputs in test equipment.
Read the heat content in the thermal protection from the local HMI and wait
until the content is zero.
11. Switch on the injection current and check that ALARM1 and ALARM2
contacts operate at the set percentage level and that the operate time for
tripping is in accordance with the set Time Constant 1 (
Tau1
).
With setting Itr = 101%
IBase1
and injection current 1.50 ·
IBase1
, the trip
time from zero content in the memory shall be 0.60 · Time Constant 1 (
Tau1
).
12. Check that all trip and alarm contacts operate according to the configuration
logic.
1MRK 502 029-UEN A
Section 15
Verifying settings by secondary injection
179
Installation and commissioning manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 92: ...86...
Page 96: ...90...
Page 102: ...96...
Page 108: ...102...
Page 112: ...106...
Page 126: ...120...
Page 140: ...134...
Page 150: ...144...
Page 234: ...228...
Page 238: ...232...
Page 250: ...244...
Page 259: ...253...