6.
Set the alarm time delay to the correct value according to the setting plan and
check the time delay, injecting a voltage corresponding to 1.2 ·
V/Hz>
.
7.
Connect a trip output contact to the timer and temporarily set the time delay
tMin
to 0.5s.
8.
Increase the voltage and note the
V/Hz>>
operate value
9.
Reduce the voltage slowly and note the reset value.
10. Set the time delay to the correct value according to the setting plan and check
the time delay
tMin
, injecting a voltage corresponding to 1.2 ·
V/Hz>>
.
11. Check that trip and alarm contacts operate according to the configuration logic.
12. Set the cooling time constant temporarily to min value (1min.) to quickly
lower the thermal content.
13. Wait for a period equal to 6 times
Tcooling
switch 20 minutes on a voltage
1.15 ·
V/Hz>
and check the inverse operate time.
Wait until the thermal memory is emptied, set the cooling time constant
according to the setting plan and check another point on the inverse time
curve injecting a voltage 1.3 ·
V/Hz>
.
14. Finally check that START and TRIP information is stored in the event menu.
15.7.4.2
Completing the test
Continue to test another function or end the test by changing the
Test mode
setting
to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
15.7.5
Voltage differential protection VDCPTOV
Prepare the IED for verification of settings as outlined in section
and
section
in this chapter.
15.7.5.1
Check of undervoltage levels
This test is relevant if the setting
BlkDiffAtULow
=
Yes
.
Check of
U1Low
Procedure
1.
Connect voltages to the IED according to valid connection diagram and figure
2.
Apply voltage higher than the highest set value of
UDTrip
,
U1Low
and
U2Low
to the U1 three-phase inputs and to one phase of the U2 inputs
according to figure
.
The voltage differential START signal is set.
Section 15
1MRK 502 029-UEN A
Verifying settings by secondary injection
194
Installation and commissioning manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 92: ...86...
Page 96: ...90...
Page 102: ...96...
Page 108: ...102...
Page 112: ...106...
Page 126: ...120...
Page 140: ...134...
Page 150: ...144...
Page 234: ...228...
Page 238: ...232...
Page 250: ...244...
Page 259: ...253...