T
es
t e
qu
ip
m
en
t
IE
D
IEC09000652-1-en.vsd
UL2
UL3
UN
UN (U4,U5)
IEC 61850
IEC09000652 V1 EN
Figure 87:
Connection example of the test equipment to the IED when test
equipment is connected to the transformer input module
15.2.5
Verifying analog primary and secondary measurement
Verify that the connections are correct and that measuring and scaling is done
correctly. This is done by injecting current and voltage to the IED.
Apply input signals as needed according to the actual hardware and
the application configuration made in PCM600.
1.
Inject a symmetrical three-phase voltage and current at rated value.
2.
Compare the injected value with the measured values.
The voltage and current phasor menu in the local HMI is located under
Main
menu/Measurements/Analog primary values
and
Main menu/
Measurements/Analog secondary values
.
3.
Compare the frequency reading with the set frequency and the direction of the
power.
The frequency and active power are located under
Main menu/
Measurements/Monitoring/ServiceValues(MMXN)/CVMMXN:x
. Then
navigate to the bottom of the list to find the frequency.
4.
Inject an unsymmetrical three-phase voltage and current, to verify that phases
are correctly connected.
If some setting deviates, check the analog input settings under
Main menu/Settings/General settings/Analog modules
1MRK 502 029-UEN A
Section 15
Verifying settings by secondary injection
151
Installation and commissioning manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 92: ...86...
Page 96: ...90...
Page 102: ...96...
Page 108: ...102...
Page 112: ...106...
Page 126: ...120...
Page 140: ...134...
Page 150: ...144...
Page 234: ...228...
Page 238: ...232...
Page 250: ...244...
Page 259: ...253...