4.
Note the voltage magnitude value and compare it with the set value,
IntBlocklevel
.
5.
Slowly increase the frequency of the applied voltage, to a value above
StartFrequency
.
6.
Check that the START signal does not appear.
7.
Wait for a time corresponding to
TimeDlyOperate
, and make sure that the
TRIP signal does not appear.
15.8.2.2
Completing the test
Continue to test another function or end the test by changing the
Test mode
setting
to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
15.8.3
Rate-of-change frequency protection SAPFRC
Prepare the IED for verification of settings outlined in section
and
in this chapter.
15.8.3.1
Verifying the settings
Verification of START value and time delay to operate
1.
Check that the settings in the IED are appropriate, especially the START
value and the definite time delay. Set
StartFreqGrad
, to a rather small
negative value.
2.
Supply the IED with three-phase voltages at their rated values.
3.
Slowly decrease the frequency of the applied voltage, with an increasing rate-
of-change that finally exceeds the setting of
StartFreqGrad
, and check that
the START signal appears.
4.
Note the operate value and compare it with the set value.
5.
Increase the frequency to rated operating conditions, and zero rate-of-change.
6.
Check that the START signal resets.
7.
Instantaneously decrease the frequency of the applied voltage to a value about
20% lower than the nominal value.
8.
Measure the time delay for the TRIP signal, and compare it with the set value.
Extended testing
1.
The test above can be repeated to check a positive setting of
StartFreqGrad
.
2.
The tests above can be repeated to check the time to reset.
3.
The tests above can be repeated to test the RESTORE signal, when the
frequency recovers from a low value.
1MRK 502 029-UEN A
Section 15
Verifying settings by secondary injection
203
Installation and commissioning manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 92: ...86...
Page 96: ...90...
Page 102: ...96...
Page 108: ...102...
Page 112: ...106...
Page 126: ...120...
Page 140: ...134...
Page 150: ...144...
Page 234: ...228...
Page 238: ...232...
Page 250: ...244...
Page 259: ...253...