FULL BODY HARNESS

I N S T R U C T I O N   M A N U A L

Summary of Contents for H11110005

Page 1: ...FULL BODY HARNESS I N S T R U C T I O N M A N U A L...

Page 2: ...101131 H212101131 SM H212101131 XXL H21210115 H21210116 H212110031 H212111031 H212300031 H2130111051 H222100041 H222100081 H222100111 H222100123 H222100141 H222100141 2XL H222100141 SM H222100181 H222...

Page 3: ...nspected before each use according to the manufacturer s instructions Allequipmentshould be inspectedby a qualifiedpersononaregularbasis To minimize the potential for accidental disengagement a compet...

Page 4: ...cient clearance below the user to allow the system to arrest a fall before the user strikes the ground or other obstruction Clearance required is dependent on the following factors HarnessStretch H H...

Page 5: ...nts snap hooks or carabiners to each other Never attach explicitly to a constituent subcomponent webbing cable or rope unless specifically provided for by the manufacturer s instructions for both subc...

Page 6: ...s onto aproperly sized webloop 7 IFEQUIPMENTIS SUBJECTEDTOAFALL Remove the equipment from service immediately if it has been subjected to the forces of a fall arrest Contact your distributor or Palmer...

Page 7: ...trap 9 Inspection ID Label 10 Warning Instruction Label 11 Standards Label Controlled Descent For controlled descent applications harnesses equipped with a single sternal level D ring one or two front...

Page 8: ...t the work positioning subsystem example lanyard Y lanyard etc to the lower hip level side or belt mounted work positioning attachment anchorage elements D rings Never use these connectionpoints for f...

Page 9: ...OSHA and ANSI standards for fall protection equipment When used as a component in a personal fall arrest system or a personal restraint system the Palmer Safety harnesses work with the full body harn...

Page 10: ...ness from service See figure below 4 Ensure that the labeling is present and legible If the labels and warnings are missing or illegible remove the harness from service 5 Inspect all metal hardware D...

Page 11: ...Pass the end of the leg strap through the buckle Repeat for the other leg strap The leg straps are attached to the harness at the sub pelvic strap This strap is one of the main load bearing strap in...

Page 12: ...l Clearance below worker is calculated from Anchorage Connection Free Fall Distance Energy Absorber Deceleration Distance Worker height Safety Factor Care must be taken to ensure that the total fall d...

Page 13: ...properly maintained e g dried and cleaned prior to storage Prior to using equipment which has been stored for long periods of time a Formal Inspection should be performed by a competent person For ha...

Page 14: ...protection Program establishes guidelines and requirements for an employer s managed fall protection program including policies duties and training fall protection procedures incident investigations a...

Page 15: ...The dorsal attachment may also be used for travel restraint or rescue When supported by the dorsal attachment during a fall the design of the Full Body Harness shall direct load through the shoulder...

Page 16: ...ments shall be used as a pair and are an acceptable attachment for rescue and entry retrieval The shoulder attachment elements shall not be used for fall arrest It is recommended that the shoulder att...

Page 17: ...SPECTION DATE INSPECTIONS ITEMS NOTED CORRECTIVE ACTION MAINTENANCE PERFORMED Approved by Approved by Approved by Approved by Approved by Approved by Approved by Approved by Approved by Approved by Ap...

Page 18: ...PECTIONS ITEMS NOTED CORRECTIVE ACTION MAINTENANCE PERFORMED Approved by Approved by Approved by Approved by Approved by Approved by Approved by Approved by Approved by Approved by Approved by Approve...