![ABB IRB 2000 Product Manual Download Page 258](http://html.mh-extra.com/html/abb/irb-2000/irb-2000_product-manual_2837986258.webp)
7.1
Check list before startup
Before switching on the power, check as follows:
1. The mains supply fused rating.
2. The supply transformer in the cabinet is connected for the correct voltage.
3. The unused circuits in the safetychains must be closed by connecting jumpering:
Auto Stop: XS3 or XT3
Manual Stop: XS3 or XT3
General Stop: XS3 or XT3
Customer emergency stop XS3 or XT3
MOTOR OFF clamping device XS3 or XT3
External axes limit switches: XS3 or XT3
Ext.drive units POWER OK* XS3 or XT3
A3-A4andB3-B4
Al - A2 and Bl - B2
A5 - A6 and B5 - B6
A7 - A8 and B7 - B8,
A9 - A10 and B9-B10
Cl - C2 and Dl - D2
A l l - A 1 2 a n d B l l - B l 2
C12 - C16
4. If the controller includes the external axes option, check that the external axes
connections are made, or the following circuits are jumpered:
Motor PTC, axis 7: XS7
7th(-12th) axes limit switches: XS7
5. The programming unit is connected.
D1-D2
A4 - A5 and B4 - B5
6. The operation modeselector on the operating panel is set to MANUAL
<250 nun/8.
INSTALLATION
S3
7:2
Summary of Contents for IRB 2000
Page 8: ...Description 1KB 2000 ...
Page 10: ...Description 1KB 2000 ...
Page 12: ...Description 1KB 2000 6 ...
Page 20: ...Description 1KB 2000 14 ...
Page 32: ...Description 1KB 2000 26 ...
Page 40: ...5 3 2 Dimensional drawings Description 34 1KB 2000 ...
Page 41: ..._200 _D D_ Description 35 1KB 2000 ...
Page 44: ...Description 1KB 2000 38 ...
Page 64: ...Description 1KB 2000 58 ...
Page 77: ...Safety 1KB 2000 IBB 3000 12 1KB 3200 1KB 6000 ...
Page 80: ...Installation H B 2000 ...
Page 82: ...Installation 1KB 2000 ...
Page 91: ...Installation 1KB 2000 12 ...
Page 95: ...Installation 1KB 2000 16 ...
Page 110: ...INSTALLATION S3 0 4 ...
Page 112: ...INSTALLATION S3 1 2 ...
Page 160: ...INSTALLATION 3 46 ...
Page 234: ...INSTALLATION 5 70 ...
Page 262: ...INSTALLATION S3 7 6 ...