![background image](http://html1.mh-extra.com/html/abb/acs800-07-0610-3/acs800-07-0610-3_hardware-manual_3428312093.webp)
Electrical installation
87
Run the cables to the swing-out frame as shown below. Wherever possible, use the existing cable trunking
(1) in the cabinet. Use sleeving wherever the cables are laid against sharp edges. Leave some slack in the
cable at the hinge (2) to allow the frame to open fully. Tie the cables to the braces (3) to provide strain
relief.
Cut the cables to suitable length. Strip the cables and conductors.
Twist the cable shields into bundles and connect them to the ground terminal nearest to the terminal block.
Keep the unshielded portion of the cables as short as possible.
Connect the conductors to appropriate terminals (see the chapter
Motor control and I/O board (RMIO)
and
the circuit diagrams delivered with the unit).
Close the swing-out frame, refasten, and close the doors.
Swing-out frame open
Cable routing example
3
1
2
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: [email protected]
Summary of Contents for ACS800-07-0610-3
Page 4: ...Phone 800 894 0412 Fax 888 723 4773 Web www clrwtr com Email info clrwtr com ...
Page 7: ...Update Notice 3 Phone 800 894 0412 Fax 888 723 4773 Web www clrwtr com Email info clrwtr com ...
Page 10: ...Update Notice 6 Phone 800 894 0412 Fax 888 723 4773 Web www clrwtr com Email info clrwtr com ...