Mechanical installation
39
Mechanical installation
What this chapter contains
This chapter describes the mechanical installation procedure of the drive.
General
See chapter
Technical data
for allowable operating conditions and requirements for
free space around the unit.
The unit should be installed in an upright vertical position.
The floor
that the unit is installed on should be of non-flammable material, as
smooth as possible, and strong enough to support the weight of the unit. The floor
flatness must be checked with a spirit level before the installation of the cabinets into
their final position. The maximum allowed deviation from the surface level is 5 mm in
every 3 metres. The installation site should be levelled, if necessary, as the cabinet
is not equipped with adjustable feet.
The wall
behind the unit should be of non-flammable material.
Provide the drive with the amount of fresh
cooling air
given in
Technical data
.
Note:
Very wide cabinet line-ups are delivered as “shipping splits”.
Required tools
The tools required for moving the unit to its final position, fastening it to the floor and
tightening the connections are listed below.
• crane, fork-lift or pallet truck (check load capacity!); iron bar, jack and rollers
• Pozidrive and Torx (2.5–6 mm) screwdrivers for the tightening of the frame
screws
• torque wrench
• set of wrenches or sockets for joining shipping splits.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: [email protected]
Summary of Contents for ACS800-07-0610-3
Page 4: ...Phone 800 894 0412 Fax 888 723 4773 Web www clrwtr com Email info clrwtr com ...
Page 7: ...Update Notice 3 Phone 800 894 0412 Fax 888 723 4773 Web www clrwtr com Email info clrwtr com ...
Page 10: ...Update Notice 6 Phone 800 894 0412 Fax 888 723 4773 Web www clrwtr com Email info clrwtr com ...