Electrical installation
74
12-pulse connection, two supply modules in parallel
L11
L21
L31
L12
L22
L32
PE
*)
Notes:
• No parallel cabling (for each module) is shown here.
It is also possible to connect all input power terminals of module 1 to the transformer Y-output and
module 2 to the transformer D-output. Note, however, that then the two bridges inside a single
module do not form a 12-pulse connection any more. This means that the benefits of the 12-pulse
connection are not available during a temporary operation with one module out of use (e.g. for
maintenance).
• Each input terminal of the supply modules must be fed through a dedicated fuse. The fuses are
specified in
Technical data
.
• The secondaries of the transformer must not be grounded.
*) Contactors are optional
L11
L21
L31
L12
L22
L32
*)
PE
L1
L2
L3
L1
L2
L3
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: [email protected]
Summary of Contents for ACS800-07-0610-3
Page 4: ...Phone 800 894 0412 Fax 888 723 4773 Web www clrwtr com Email info clrwtr com ...
Page 7: ...Update Notice 3 Phone 800 894 0412 Fax 888 723 4773 Web www clrwtr com Email info clrwtr com ...
Page 10: ...Update Notice 6 Phone 800 894 0412 Fax 888 723 4773 Web www clrwtr com Email info clrwtr com ...