4-37
ENG
KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE
GEAR
Extent of removal
Order
Part name
Q’ty
Remarks
RPIMARY DRIVE GEAR REMOVAL
Preparation for
Drain the transmission oil.
Refer to “TRANSMISSION OIL REPLACE-
removal
MENT” section in the CHAPTER 3.
Clutch cable
Disconnect at engine side.
Bolt (brake pedal)
Shift the brake pedal downward.
Radiator hose 4
Disconnect at water pump side.
Bolt (push rod)
Refer to “CYLINDER HEAD, CYLINDER
AND PISTON” section.
1
Kick starter
1
2
Crankcase cover (right)
1
3
Bolt (Primary drive gear)
1
Only loosening
Refer to “REMOVAL POINTS”.
4
Primary driven gear
1
Refer to “CLUTCH AND PRIMARY
DRIVEN GEAR”section.
5
Primary drive gear
1
EC4C0000
KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE GEAR
EC4C8000
PRIMARY DRIVE GEAR
1
Extent of removal:
1
Primary drive gear removal
10 Nm (1.0 m•kg, 7.2 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
48 Nm (4.8 m•kg, 35 ft•lb)
1C3-9-32-4C 4/6/06 2:12 PM Page 2