4-31
CLUTCH AND PRIMARY DRIVEN GEAR
ENG
Extent of removal
Order
Part name
Q’ty
Remarks
PRIMARY DRIVEN GEAR, PUSH
ROD AND PUSH LEVER AXLE
REMOVAL
1
Push rod 1
1
2
Circlip
1
3
Plain washer
1
4
Bearing
1
5
Ball
1
6
Push rod 2
1
7
Nut (clutch boss)
1
Use special tool.
8
Lock washer
1
Refer to “REMOVAL POINTS”.
9
Clutch boss
1
10
Plain washer [D=ø34mm (1.34 in)]
1
11
Primary driven gear
1
12
Bearing
1
13
Plain washer [D=ø34mm (1.34 in)]
1
14
Push lever axle
1
EC498200
PRIMARY DRIVEN GEAR, PUSH ROD AND PUSH LEVER AXLE
Extent of removal:
1
Push rod and push lever axle removal
2
Push rod 1 disassembly
3
Primary driven gear removal
2
3
1
1
1
3
80 Nm (8.0 m•kg, 58 ft•lb)
1C3-9-32-4B 4/6/06 2:11 PM Page 28